The Hidden Waste in Handovers Between Departments
Most delays happen in the gaps between departments, where work waits and information gets lost. How to find the waste hidden in handovers and fix it with simple, shared standards.

Ask any department how long its part of a process takes, and the answer is usually reasonable. Sales takes an hour to prepare the order, the warehouse takes half a day to pick it, finance takes twenty minutes to invoice. Yet the customer waits a week.
The missing days sit in the handovers between departments, where work waits, information gets lost and nobody feels responsible.
Why handovers are where time disappears
Inside a department, people can see the work, talk to each other and fix small problems on the spot. At a handover, the work crosses into a different team with its own priorities, its own systems and often its own understanding of what “done” means. Each department optimises its own part, and the handover belongs to no one.
Lean thinking, an approach to removing waste that began in manufacturing, has long pointed out that much of the elapsed time in a typical process is spent waiting rather than working. Handovers are where a large part of that waiting happens. They also generate rework, because information that was clear on one side arrives incomplete on the other.
A scenario from a private hospital
Consider a private hospital in Amman where a patient needs an MRI (magnetic resonance imaging) scan covered by insurance. The consultant writes the request in the clinic. The clinic coordinator sends it to the insurance office. The insurance office submits a pre-approval request to the insurer and waits. Once approved, the approval is passed to radiology scheduling, which calls the patient. After the scan, the report goes back to the consultant, and billing prepares the claim.
That process crosses at least five handovers. In practice, the request might sit in the coordinator’s tray until the afternoon batch, the insurance office might find the diagnosis code missing and send it back, radiology might not learn about the approval until the patient calls to ask, and billing might lack the approval number when the claim is prepared. Each team does its own job well. The patient still waits days longer than necessary, and the hospital loses time on corrections and rejected claims.
Five kinds of handover waste
1. Waiting in a queue
Work sits until the receiving team notices it or gets to it. Batching makes this worse: if the coordinator sends requests twice a day, each request can wait half a day before anything happens.
2. Incomplete information
The sender passes on what they think is needed, the receiver needs something else. The work bounces back, often more than once.
3. Re-entering data
The same details are typed into a second system, a form or a spreadsheet. Every re-entry costs time and adds a chance of error.
4. Unclear status
Once work leaves a department, the sender cannot see what happened to it. People call and message to ask, which interrupts everyone and still does not give a reliable answer.
5. No owner for the whole process
Each department owns its step. Nobody owns the end-to-end time, so nobody notices when it grows from three days to eight.
Setting a handover standard
The most effective fix is often a short, agreed standard for each important handover. It does not need a new system. It needs both sides to sit together and agree on a few points:
- Definition of ready. What must be complete before work can be passed on? For the MRI request, that might be the diagnosis code, the procedure code, the insurer and the policy number.
- One channel. Where does the handover happen? A specific queue in the hospital system, a shared tracker or a form, not a mix of paper, email and phone calls.
- Response time. How quickly must the receiving team acknowledge and start the work? Agree a realistic target, such as within two working hours.
- Visible status. Both sides can see where each case is: received, in progress, waiting for external party, completed.
- Return rules. If something is missing, the work goes back with a specific reason, and returns are counted so the cause can be fixed.
- End-to-end owner. One person, often a process owner above both departments, watches the total time and acts when it grows.
Agree the standard in a joint session with both teams, using a few real cases from the past month. Standards written by one side and sent to the other tend to be read as criticism, while standards built together are usually followed.
Once the standard works manually, parts of it can be automated. A form that cannot be submitted without mandatory fields enforces the definition of ready. A workflow tool or the hospital system can route the request, notify the next team and update status automatically. Automation works well here precisely because the rules are now clear.
Measuring the improvement
Track two or three measures for each critical process: total elapsed time from start to finish, the number of times work is sent back, and the share of time spent waiting. Review them monthly with representatives from every department involved. These shared measures change the conversation. Instead of each team defending its own step, people start asking where the whole process loses time.
In the hospital example, the target might be to move a routine insured MRI from request to scheduled appointment in a set number of working days, depending on insurer response times. The figure matters less than the fact that someone is looking at it.
Joining up the work between teams
Run the quick test above on the process customers complain about most. If waiting between teams turns out to be most of the elapsed time, pick the worst handover and agree a standard for it with both teams within the month.